EasyManua.ls Logo

EKOM DK50 D - Stabilizing the Compressor before Shipping; Shutdown; Equipment Disposal

EKOM DK50 D
94 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MAINTENANCE
20 NP-eVENT-16_10-2018
Stabilizing the compressor before shipping
Before shipping, the compressor must be stabilized to prevent movement.
The procedure is illustrated on page 9.
Remove the front and back covers unscrewing screws on the cabinet side,
disconnect the ground connector on the covers.
Disassemble the internal back cover (18) unscrewing four screws.
Insert the shipping elements (21) under and above the compressor.
Assemble the internal back cover (18), connect the ground connector on
the covers, and insert the covers and the suction filter.
SHUTDOWN
If the compressor is not going to be used for a long period of time,
disconnected it from the main power supply and release the pressure in the
air tank.
EQUIPMENT DISPOSAL
Disconnect the equipment from the main power supply.
Release the pressure in the air tank.
Dispose of the equipment according to local regulations.
Parts used in this product have no negative impact on the environment
when disposed of properly.

Table of Contents

Other manuals for EKOM DK50 D

Related product manuals