22 Installation Manual
Mounting System
1" (one
on each
side)
Ensure 1"
between
inverter
and wall
1" (four locations
underneath the
inverter)
1.5" (two locations, one
on each side of the 5
kWh battery enclosure)
1.5" (multiple locations
on the sides of the
battery enclosure)
1" (one location
underneath the Auto-
Transformer)
If needed, use a Greenlee Knockout Punch to create a punch
that will work for your installation.
Please note that all measurements below are for conduit fittings.