EasyManua.ls Logo

Festo CPX-FB23 - 3 Commissioning as Function Module F24; General Information on Commissioning; Configuration and Addressing; Number of Inputs;Outputs

Festo CPX-FB23
84 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3 Commissioning as function module F24
Festo P.BE-CPX-FB23-24-EN 1305a English 33
3 Commissioning as function module F24
3.1 General information on commissioning
Note
Before commissioning you must have installed the CPX terminal correctly
( Chapter 2).
General information on commissioning the CPX terminal as well as a detailed description
of individual parameters is found in the CPX system description (P.BE-CPX-SYS-…).
Information on commissioning the pneumatic interface and I/O modules is found in the
description for the CPX I/O modules (P.BE-CPX-EA-…).
Instructions on commissioning the pneumatic components can be found in the corres-
ponding description of pneumatics.
3.2 Configuration and addressing
3.2.1 Number of inputs/out puts
Caution
For operation of the bus node CPX-FB23-24 as a function module F24 ( CC-Link
version 2. 0), the DIL switch element 3. 8 of the DIP-switch 3 must be set on “ON”
( section 2.4.6).

Table of Contents

Other manuals for Festo CPX-FB23

Related product manuals