FT-70/75 Fill Level Inspectors Operator’s Guide
2-16
4. Lower the bracket until the trigger beam contacts the container
at the widest part of the cap or lid. This point should also be
low enough to contact the trigger beam if a cap is missing.
5. Tighten the height locking handle to secure the trigger beam
positioning.
6. If you will not be performing further alignment procedures,
reactivate the X-ray Generator. For more information see “The
Safety Interlock Switch” on page 2-4.
Industrial Dynamics Company, Ltd. Document 40274-0600