STRADA PAL ā MAINTENANCE MANUAL
101/149
8.4.9 Replacing the main cables
8.4.9.1 Preliminary operations
A. Open the maintenance door
B. Turn off the terminal
8.4.9.2 Replacement
A. Remove the maintenance rack
B. Replace the entire wired rack on site and replace the faulty main cable in the
workshop.
8.4.9.3 Installation
A. Repeat the previous steps in reverse.
8.4.9.4 End of procedure
A. Turn on the terminal
B. Close the maintenance door
C. Perform a complete function test.