EasyManua.ls Logo

FLOWBIRD STRADA PAL - Page 105

Default Icon
149 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
STRADA PAL – MAINTENANCE MANUAL
105/149
Replacing the collection trapdoor (2/2)
8.5.2.3 Installation
A. Repeat the previous steps in reverse.
8.5.2.4 End of procedure
A. Reassemble the maintenance door
B. Perform an opening / closing function test of the trapdoor.
C. Turn on the terminal
D. Perform a collection test.

Table of Contents

Related product manuals