Commissioning
Startup
inverter
Meter Socket Panel Grid
Generator
aGate
aPower
① ②
③
④
⑤
⑥
① Disconnect the grid power supply switch in aGate
② Disconnect the generator input switch in aGate
① Disconnect the solar switch in aGate
④ Close the aPower AC input breaker switch on aGate.
⑤ Press the side cabinet switch on aPower, and wait for about half a minute until the power LED of aPower turns on and flashes at
a frequency of 1 cycle/sec. aPower has been started up normally.
⑥ Turn on the EMS switch on aGate. EMS powered on when the switch LED turns red.