Step 11: Commissioning
Energy Storage System Commissioning
Turn on the aPower switch
Turn off other external
switches
Install the APP
Register a user account
Log in to the local account
Set time, network, and location
information
Set the postal address
Set energy policy +2030.5
resource address
Set on-grid and off-grid
parameters and other electrical
parameters
Register the customer account
and device S/N information
Close the photovoltaic solar
breaker switch
User Account login
Set the working mode of the
device
Close the mains breaker switch
Turn on the aPower switch to
test the charge and discharge
function of the battery
Control intelligent load on/off End
Franklin Home Power Commissioning Flowchart