Commissioning
Return to the home page, and click on “Device settings” to register the user E-mail account with the
equipment.
Redirection
On the
“System
parameters
setting” page,
set up the
parameters of
family solar
generation
system and
electric
generators.
Click on
“System
parameters”.
Operate aGate and close the grid power supply
Close the grid power input switch on aGate. The grid icon will turn on at the energy flow page on the application.