Hydrostatic pressure test
$/./4INSTALLARELIEFVALVEWITHAPRESSURE
HIGHERTHAN03)'4HISISTHEMAXIMUMALLOW-
ABLERELIEFVALVESETTINGFORTHE&REE3TYLE
®
boiler.
&AILURETO COMPLY COULD PREVENT THE RELIEF
VALVEFROMOPERATINGASNEEDEDRESULTINGIN
POSSIBILITYOFSEVEREPERSONALINJURYDEATHOR
SUBSTANTIALPROPERTYDAMAGE
5SETWOWRENCHESWHENTIGHTENINGANYPIPE
CONNECTIONTOTHEBOILER
. Failure to prevent the
BOILERPIPESFROMTURNINGCOULDDAMAGEPIPESOR
heat exchanger, resulting in possible severe personal
injury, death or substantial property damage.
0RESSURETESTTHEBOILERBEFOREPERMANENTLYATTACHINGWATEROR
gas piping or electrical supply.
Install pipe fittings for relief valve and
P/T gauge
1. Install the reducing tees, and close nipples, field supplied,
located and oriented as shown in Figure 6, page 11. !PPLY
pipe dope to all fittings sparingly.
$/ ./4 INSTALL THE RELIEF VALVE UNTIL AFTER THE
HYDROSTATIC TEST
. Temporarily install a ¾” pipe
PLUGINTHERELIEFVALVELOCATIONASDIRECTEDINTHESE
INSTRUCTIONS4HEPLUGMUSTBEREMOVEDAFTERTHE
test.
#ONNECTTHERELIEFVALVE/.,9ONTHE"/),%2
3500,9 /54,%4 ./4
the boiler return. Con-
NECTTHERELIEFVALVEONLYASSHOWNINTHISMANUAL
%NSURERELIEFVALVEISLOCATEDABOVEHEATEXCHANGER
Failure to comply with the above could prevent
THERELIEFVALVEFROMOPERATINGASNEEDEDRESULTING
INPOSSIBILITY OF SEVEREPERSONAL INJURYDEATHOR
substantial property damage.
2. Install the test pressure/temperature gauge (field supplied)
to the reducing tee as shown in Figure 7, page 11.
Install fittings and valves required for
hydrostatic testing (supplied by installer)
1. 4HEFOLLOWINGPIPINGCOMPONENTSSUPPLIEDBYINSTALLERARE
REQUIREDFORTHETESTCONlGURATION
a. 4WOSHUTOFFVALVESÐv.04ON&31”NPT on
FS-155).
b. Two close nipples (¾”NPT on FS-80/120, 1”NPT on
FS-155).
c. ¾” NPT pipe plug.
d. Pressure/temperature gauge.
e. ¾” NPT boiler drain valve.
2.
4%-0/2!2),9 INSERT A Ðv .04 PIPE PLUG IN THE RELIEF VALVE
TAPPING !FTER THE HYDROSTATIC TEST THIS PLUG must be removed
AND THE RELIEF VALVE MUST BE INSTALLED
Fill and pressure test
1. See Figure 6, page 11,FORUSEWITHTHEFOLLOWINGINSTRUCTIONS
2. CLOSE the boiler drain valve (item 10). Connect a hose to
FRESHWATERSUPPLYANDTOTHEDRAINVALVE
3. 0LACEA BUCKETUNDERTHEENDSOF THE ISOLATION VALVES
(item 8 and 9) to catch water drippings.
4. CLOSE isolation valve item 9, then crack open the valve
slightly. Leave top isolation valve item 8 open.
5. 3LOWLYOPENTHEBOILERDRAINVALVEITEMANDFRESHWATER
supply to fill boiler with water. The boiler and piping will
lLLQUICKLYBECAUSEOFTHELOWWATERCONTENT
6. 7HENWATERBEGINSTO mOWFROMBOTTOM ISOLATION VALVE
(item 9), close the valve.
7. #ONTINUElLLINGUNTILWATERmOWSFROMTOPISOLATIONVALVE
(item 8), then close the valve.
8. When pressure on the pressure/temperature gauge (item
4) reaches at least 45 PSIG, but no higher than 55 PSIG,
CLOSE the boiler drain valve (item 10).
9. (OLDATTESTPRESSUREFORMINUTES
$ONOTLEAVEBOILERUNATTENDED!COLDWATERlLL
could expand and cause excessive pressure, result-
ing in severe personal injury, death or substantial
property damage.
10. -AKESURE CONSTANTGAUGE PRESSUREHASBEEN MAINTAINED
THROUGHOUTTEST#HECKFORLEAKS2EPAIRIFFOUND
,EAKSMUSTBE REPAIREDAT ONCE Failure to
do so can damage boiler, resulting in substantial
property damage.
Do not use petroleum-based cleaning or sealing
compounds in boiler system. Gaskets and seals
in the system may be damaged. This can result in
substantial property damage.
Drain and remove fittings
1. $ISCONNECTlLLWATERHOSEFROMWATERSOURCE
2. Drain boiler through drain valve
(item 10).
5SECAUTIONWHENRELEASINGPRESSUREFROMTHEBOILER
Rapid water flow could cause injury.
3. 2EMOVEHOSEAFTERDRAINING
4. 2EMOVENIPPLESANDVALVESUNLESSTHEYWILLREMAINFORUSEIN
the system piping.
5. 2EMOVEPLUGANDINSTALLRELIEFVALVEASSPECIlEDINTHEFOL-
LOWING7!2.).'
2EMOVE PLUG FROM RELIEF VALVE STREET ELBOW )NSTALL
THE RELIEF VALVE IN THE ÐvSTREET 3EE page 40 to install
RELIEF VALVE DISCHARGE PIPING &AILURE TO INSTALL THE
BOILER RELIEF VALVE COULD RESULT IN SEVERE PERSONAL
injury, death or substantial property damage.
3 Prepare boiler continued