EasyManua.ls Logo

Froling T4e - Page 50

Froling T4e
76 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
In “Boiler off” status:
Open the insulated door (A)
Remove the key plate (B) from the safety limit switch
Open the side clamps (C), remove the ash container cover and check the ash
level in the two chambers
If either of the two chambers is more than two thirds full, empty the ash
container
Put the cover on the ash container and use the side clamps (C) to close it again
Open the ash container clamp using the locking lever (D)
Remove the ash container from the boiler
Close the two openings at the back of the ash container with the slide plates
Starting at boiler type
200:
4
Operating the System
Checking the fill level of the ash container and emptying if required
50 Froling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com

Table of Contents

Other manuals for Froling T4e

Related product manuals