EasyManua.ls Logo

Fronius IG Plus 35 - Opening Fronius IG Plus for Service;Maintenance

Fronius IG Plus 35
157 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
62
Opening Fro-
nius IG Plus
for Service/
Maintenance
Procedure for opening the Fronius IG Plus for service or maintenance:
1. Disconnect the AC and DC sides from the inverter
2. Open the connection area
3. Turn off DC main switch
4. Remove plate covers
5. Allow the capacitors to discharge (5 minutes)
6. If present, remove the fuse for the solar module ground
7. If present, remove string fuses
8. Disconnect DC cable
9. Disconnect AC cable
1
4
1
2
3
*)
Fronius recommends a fuse with 1
A and a dimension of 10 x 38 mm
for solar module grounding.
*) Plastic bolts are included in the
Fronius IG Plus scope of delive-
ry.
Inserting the fuse will ground the
solar module at the positive pole.
Solar Module
Ground: Inser-
ting Fuses
(continued)

Table of Contents

Related product manuals