EasyManua.ls Logo

Fujitsu AIRSTAGE UTY-DCGGZ2 - 1-5. Initial Setting

Fujitsu AIRSTAGE UTY-DCGGZ2
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
En-12
1-5. InitialSetting
After Central remote controller installation work is complete, perform initial setting by the following procedure before
starting to use the system.
Ifthepoweristurnedoffwithin5minutesofnishingthesettings,thesettingsmaynotbesaved.
Note
Initialsettingstart
Initialsettingend
Operation start
(Refer to Chap. 2.)
Turnonthepower
(Breaker ON)
Onlywhenthepoweristurnedonforthersttimeorimmediatelyafter
initialization is set, the following wizard are displayed in wizard format.
Perform the settings.
(1) LanguageSetting→Refer to 3-4-1(4).
(2) PanelCalibration→Refer to 3-2-2(4).
(3) CentralControllerAddressSettingRefer to 3-4-2(4).
(4) IndoorUnitRegistration→3-4-3-1AddressNumberRegistration.
(5) DateSetting→Refer to 3-2-4-1, 3-2-4-2.
Monitoring screen is displayed. Perform the settings as necessary.Refer to
Chap. 3.
Air conditioning starts on the Monitoring screen.

Related product manuals