RX600 S6 Service Supplement 21
4 Replacement routines
V CAUTION!
When handling systems and boards, make sure you observe the safety
information in the chapter "Safety instructions" on page 17.
4.1 Preparation
To replace components which are not hot-pluggable, proceed as follows:
Ê Terminate all applications and shut down the server correctly.
Ê If your operating system has not switched off the server, press the On/Off
button for 5 seconds.
Ê Disconnect all AC power cords from the system and wait for at least 15
seconds.
Ê Disconnect all cables on the rear side of the server.
4.1.1 Opening the server
I You will find a detailed description of how to open the server in the
"PRIMERGY RX600 S6 Server Options Guide".
Figure 2: Extending the server out of the rack