62
RS-232C CONNECTION
2) Transmit the air leak tester settings data
(1) Set the air leak tester to RDY status.
* The RDY status can be confirmed by viewing the RDY signal from REMOTE.
* Communications will not take place other than in RDY status. If not in the RDY state,
input signals will be ignored.
(2) Transmit the settings value request to the air leak tester.
Comman
END
02 Group specification 0~3 CR/L
tes 8 bytes 2 bytes
(3) The current settings data is sent from the air leak tester.
Command GROUP DLY CHG1 CHG2 BAL DET EXH -NGset +NGset
03
Group
Specification
0~3
DLY
Process
time
data
CHG1
Process
time
data
CHG2
Process
time
data
BAL
Process
time
data
DET
Process
time
data
EXH
Process
time
data
-NGset
data
+NGset
data
2 bytes 8 bytes 8 bytes 8 bytes 8 bytes 8 bytes 8 bytes 8 bytes 8 bytes 8bytes
-NGset
(leak
amount)
+NGset
(leak
amount)
P.NG value
Volume
value
-NGunit
(leak
amount)
+NGunit
(leak
amount)
Volume
unit
Leak amount
display unit
End
-NGset
(leak
amount)
data
+NGset
(leak
amount)
data
P.NG value
data
Volume
Value
data
-NGunit
(leak
amount)
data
+NGunit
(leak
amount)
data
Volume
unit
data
Leak amount
display unit
data
CR/LF
8 bytes 8 bytes 8 bytes 8 bytes 8 bytes 8 bytes 8 bytes 8 bytes 2 bytes
* Refer to the data receiving section in item 1)-(2) *for data precautions.
3) Test data is sent.
(1) Immediately after the test ends (after the EXH process), the air leak tester will transmit
the following data:
COMMAND GROUP TEST No.
Judge
Result
Measured value
Test
pressure
END
04
GROUP
specification
0~3
1~9999
Continuous
number
O
P.NG
B+NG
B-NG
D+NG
D-NG
DET process
Final differential
pressure value or
Final leak amount
Pressure in
the CHG
process
CR/LF
2 bytes 8 bytes 8 bytes 8 bytes 8 bytes 8 bytes 2 bytes
* Refer to the data receiving section in item 1)-(2) * for data precautions.
* If the test will not advance to the DET process due to P.NG, B+NG or B-NG errors, blanks (20h)
are inserted into the data.