OPERATION - 3
To store the boiler in a corrosion-free situation there are three practical solutions:
1. Fullyoodtheboilertoexcludeasmuchairaspossible.
2. Drain the boiler and tank completely (see Section 3.5 - Draining the Boiler).
Remove all hand holes and boiler elements (see Section 4.4.1 - Element Removal).
3. Same as 2. but also introduce a form of convection heating into the boiler.
3.8 BOILER SHUT-DOWN
3.8.2 LONG TERM SHUT-DOWN (WEEKS)
3.8.1 SHORT TERM SHUT-DOWN (HOURS)
1. Select Boiler OFF on the operators control panel switch.
The elements will de-energise.
2. Close the steam outlet vale