EasyManua.ls Logo

FULTON Electropack Series - Operator Tests and Checks

FULTON Electropack Series
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EP18-72-IOMM-2015-7
Fulton Ltd
Page 32
MAINTENANCE - 4
WARNING
Prior to the commencement of any work requiring the removal of access panels, the electrical supply
to the boiler must be isolated.
Ensure any residual pressure within the boiler is completely vented before working on the pressure
vessel.
!
CAUTION
It is essential that regular checks are made to ensure that scale build-up is not taking place within the
boiler. Such checks will ensure that water treatment being applied to the boiler feedwater is effective.
Makesurethatliftingequipmentcomplieswithalllocalregulationsandissuitableforthejob.
Youcanbeinjuredifyouusefaultyliftingequipment.
Make sure the lifting equipment is in good condition.
!
IMPORTANT
If any fault is found during these procedures, shut down the
boiler immediately and consult Fulton Ltd.
!
4.7 SCHEDULE OF OPERATOR TESTS AND CHECKS
The following schedule is the advice of Fulton Ltd. The frequency of tests and checks may vary
accordingtositeriskassessmentand/orspecicrequirementsofthecountry/territorythatthe
boiler is installed in. Failure to maintain the boiler adequately may void the Fulton guarantee.
Maintenance must be carried out by competent, trained personnel
If any fault is found during these operations, contact your Fulton representative.
The following procedures are designed to prevent the build-up of scale, silt or sludge in the
bottom of the boiler and on the elements. Personnel involved in doing this work must have
received the appropriate training in all aspects of maintenance and safety procedures.
In addition to these procedures, the advice of a water treatment specialist should be sought and
followed.

Related product manuals