EasyManua.ls Logo

FULTON Electropack Series - Water Level Gauge (Sight Glass) Blowdown

FULTON Electropack Series
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EP18-72-IOMM-2015-7
Fulton Ltd
Page 27
MAINTENANCE - 4
4.3.2 WATER LEVEL GAUGE (SIGHT GLASS) BLOWDOWN
Blowdown the water level gauge (sight glass) set 1.
1. Open the water level gauge glass blowdown valve A
2. Close (for approx. 3 seconds) the top gauge valve B
3. Open valve B
4. Close (for approx. 3 seconds) the bottom gauge valve C
5. Open valve C
6. Close valve A
Repeat for gauge set 2
On completion of the blowdown procedure ensure that all isolation valves are OPEN and all
blowdown valves are CLOSED.
Note: Where a boiler is operating continuously at steam pressure, advice should be taken from Fulton Ltd as to
the appropriate blowdown procedure.
WORKING
POSITION
STEAM
BLOWDOWN
WATER
BLOWDOWN
A
A
A
B
BB
C
C
C
Operating Positions
Figure. 12 - Water Level Gauge Operating Positions

Related product manuals