EP18-72-IOMM-2015-7
Fulton Ltd
Page 33
MAINTENANCE - 4
1. Visually inspect boiler casing exterior for signs of leakage (see Section 4.1 - Visual Checks):
a) Steam and feedwater pipework
b) Valvesandttings
2. Low water level check (see Section 4.2.2 - Low Water Level Check).
3. Blowdown the boiler (see Section 4.3.1 –Main Boiler Blowdown).
Note: Isolate the electrical supply to the boiler and set the selector switch to OFF.
4. Visually inspect boiler casing interior for signs of leakage (see Section 4.1 - Visual Checks):
a) Steam and feedwater pipework
b) Valvesandttings
c) Elements
4.7.1 DAILY
4.7.2 WEEKLY IN ADDITION
WARNING
Ensure the main electrical supply is isolated before starting work.
!
WARNING
Ensurethettingsaroundthesteamsafetyvalve(s)aresecure.
The safety valve will be very hot, do not operate the safety valve without protection.
!
5. Ensure that the pipe from the safety valve outlet is not damaged and that it continues to a safe
blowdown point.
6. Pump test (see Section 4.2.1 - Feedwater Pump Test).
4.7.3 MONTHLY IN ADDITION
7. Visually inspect the feedwater tank interior (see Section 4.5.1 - Feedwater Tank Internal
Inspection).
8. Check the element and pump contactors are working correctly by manually depressing them
(see Figure. 5 Electrical Connections).