EP18-72-IOMM-2015-7
Fulton Ltd
Page 38
MAINTENANCE - 4
DAILY TESTS 1 2 3 4 5 6 7
Date
1. Visual Inspectionofcasingexteriorpipeworkandttingsforsignsofleakage Y - N Y - N Y - N Y - N Y - N Y - N Y - N
2. Low Water Level Check - low water indicator illuminates, alarm sounds and feedwater pump
stops/starts.
Y - N Y - N Y - N Y - N Y - N Y - N Y - N
3.
Blowdown, Boiler
Duration seconds.
T
est Time.
4.
Pressure gauge
reading for blowdown tests.
Boiler water and water treatment values must be within known tolerances of the datum.
5.
Boiler W
ater. datum value. TDS. reading
datum value. PH reading
6. Oxygen Scavenger
Concentration
datum value. reading
7.
Brine level correct Y -
N Y - N Y - N Y - N Y - N Y - N Y - N
WEEKLY TESTS 7+
8. Visual Inspectionofcasinginteriorpipework,ttingsandelementsforsignsofleakage Y - N
9.
Pump T
est - Feedwater pump, start/stop Y - N
10.
Safety valve outlet pipe
to safe blowdown point and free of damage Y - N
Test results and actions taken
Day 1. sig. Day 5. sig.
2. sig. 6. sig.
3. sig. 7. sig.
4. sig. 7+. sig.
Log examined by: Date:
Electric Steam Boiler - Daily and Weekly Tests
Model:
Boiler Number: