EasyManua.ls Logo

GE AKTA GO - Page 66

GE AKTA GO
117 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Purge the pump and confirm it
is free from air
Follow the steps below to purge the two pump heads of the pump so that they are free
from air.
ActionStep
In the Process Picture pane, click Injection valve and select Waste.1
Result: The injection valve switches to waste position and opens inlet A.
In the Process Picture pane, click Inlet Valve and select the inlet that will be
used at the beginning of the run.
2
Result: The inlet valve opens the selected inlet.
66 ÄKTA go Operating Instructions 29360951 AC
5 Prepare the system for a run
5.2 Prime inlets and purge pump heads

Table of Contents

Related product manuals