EasyManua.ls Logo

GE AKTA pilot 600 - Page 105

GE AKTA pilot 600
140 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ActionStep
Clean the conductivity flow cell before calibration (see Section 5.3.1 Clean
the conductivity flow cell, on page 96).
1
Disconnect the tubing from the bottom of the conductivity monitor and re-
place it with a Luer-to-SNAP connector.
2
Disconnect the tubing from the top of the conductivity monitor and replace
it with a piece of tubing leading to the waste container.
3
W
Select System:Settings in UNICORN System Control module.4
In the Instructions list, select Conductivity:Cond Temp Compensation.5
Set the Compensation factor to 0 and click OK.6
Select System:Calibrate from the main System control menu.7
ÄKTA pilot 600 User Manual 29274559 AA 105
5 Maintenance
5.4 Calibration procedures
5.4.2 Calibrate the conductivity monitor

Related product manuals