ActionStep
Remove the flow cell from the detector. Do not touch the exposed optical
fiber connectors.
Note:
If you do accidentally touch the optical fiber connectors, clean them according
to Clean the optical fiber connectors, on page 116.
5
If you intend to reuse the flow cell that you have removed, move the protec-
tive caps from the replacement flow cell to the optical fiber connectors on
the removed flow cell to protect them from dust. Take care not to damage
the flow cell.
6
Fit the replacement UV flow cell to the detector.7
Fit the detector with the replacement flow cell to the instrument front panel.
Pull the latch upwards to secure the detector.
8
Connect the tubing to the new flow cell.9
Switch on the instrument.10
Result: The flow cell path length is automatically recognized by the monitor
when a new flow cell is connected.
Clean the optical fiber
connectors
Follow the steps below to clean the optical fiber connectors.
116 ÄKTA pilot 600 User Manual 29274559 AA
5 Maintenance
5.5 Replacement procedures
5.5.3 Replace the UV monitor flow cell