Modifications reserved Pagina 22/90
OPM_SPE_XXX_60K_60K_7GB_V010.doc Operatine Manual SitePro 60 kVA
4.4 PLACE OF INSTALLATION
4.4.1 UPS location
WARNING !
UPS installation and connection must be performed by QUALIFIED SERVICE
PERSONNEL only.
If optional cabinets and accessories are included with the UPS, please refer to those
accompanying manuals for installation and operating instructions.
It is important to have a clean, dust-free place provided with proper ventilation or air-conditioning to
keep the ambient within the specified operating range.
The recommended air inlet temperature is from 20°C (68°F) to 25°C (77°F) (max. 35°C / 95°F).
Refer to Section 4.5.
Check for sufficient floor load capacity before installing the UPS and the battery.
Refer to Section 4.1.1.
For battery installation follow the local codes and the recommendation of the battery supplier.
NOTE !
Temperature is very important for valve-regulated batteries (maintenance free).
Operation at temperatures higher than 77°F (25°C) will reduce battery life.
A single-phase power socket should be provided for connection of power tools, test equipment or
connectivity devices.
S
P
_
0
6
0
_
S
7
_
U
P
S
d
i
s
p
o
s
i
t
i
o
n
_
G
E
_
0
1
Min.
400mm / 16"
5
0
0
m
m
/
2
0
"
2
0
0
m
m
/
8
"
M
i
n
.
M
i
n
.
Fig. 4.4.1-1 SitePro 60 kVA disposition
The UPS cabinet can be positioned against the wall
but, in order to improve the ventilation and to make
easier the maintenance operations for UPS and
battery, we recommend a minimum distance of 200
mm (8”) from the wall.
The right side of the UPS cabinet must be
accessible for maintenance operation.
Clearance around the front should be sufficient to
enable free passage of personnel with the doors
fully opened.
Recommended minimum clearance between ceiling
and top of the UPS should be 400 mm (16”) for
proper cooling air exhaust.
In case of optional cabinets (THD filters,
transformers, battery), the additional cabinets must
be placed beside the left end of the UPS cabinet
face.
See Chapter 8. – OPTIONS.