4.8 WIRING CONNECTION
WARNING !
UPS installation and connection must be performed by QUALIFIED SERVICE
PERSONNEL only.
Refer to the “Safety prescriptions - Installation” described on Section 1.
4.8.1 Power connections
Carefully read the following recommendations before proceeding:
Ensure that the AC and DC external isolators are Off, and prevent their inadverted operation.
Do not close any external isolators prior to the commissioning of the equipment.
The input/output cables must be put in order and fixed, taking care to avoid risk of short-circuit
between different poles.
The earthing and neutral connection of the electrical system must be in accordance with local
regulations.
In case of additional cabinets containing batteries, filters, input/ output transformers, etc, the earth
must be connected to the UPS main earth.
Once the power cables have been connected, re-install the internal safety shields and close the
cabinets by re-installing all external panels.
MAINS INPUT OUTPUT LOAD
SP_060_S6_connection_01GB
+-
X1
Fig. 4.8-1 Power connections enclosure
Battery power cables are connected to busbars using M10 bolts X1 terminals: max. rating 70mm
2
Separate input rectifier / bypass (BR1, BR2 and BR3 must be removed)
L1-1 Rectifier input L1 L2-1 Rectifier input L2 L3-1 Rectifier input L3
L1-2 Bypass input L1 L2-2 Bypass input L2 L3-2 Bypass input L3
N1 Neutral mains input PE Earth mains input
Common input rectifier / bypass (BR1, BR2 and BR3 must be fitted)
L1-1 Rectifier + bypass L1 L2-1 Rectifier + bypass L2 L3-1 Rectifier + bypass L3
N1 Neutral mains input PE Earth mains input
Output load
L1 - Load L1 L2 - Load L2 L3 - Load L3 N2 - Neutral output load PE - Earth output load
Battery
+ Positive pole of the battery
- Negative pole of the battery
Do not insert the battery fuses before the
commissioning.
NOTE !
To meet standards concerning electromagnetic compliance, the connection between the UPS
and external battery must be done by using a shielded cable or suitable shielded (metal)
conduit!
This UPS is only designed to operate in a wye-configured electrical system with a solidly
grounded neutral.
If the UPS is equipped with an input transformer for galvanic isolation, the secondary of the
transformer must be wye-configured with neutral solidly earthed.