OPM_SPE_XXX_60K_60K_7GB_V010.doc Operatine Manual SitePro 60 kVA
5. Close the output switch Q1.
The UPS output terminals must be supplied by the mains power through the automatic bypass.
The LCD display must indicate the status “LOAD ON BYPASS”.
Now the control panel should indicate a normal situation (No alarms).
LED “service check” is OFF.
LEDs 1, 2, 3, 4b, 7 and 8 light up.
LEDs 4a, 5, 6 and 9 are OFF.
6. Inverter start.
Press the key "I" on the control panel.
The inverter will start up. LED 5 (inside inverter symbol) must be blinking.
In a short time, when the inverter voltage is confirmed, the LED will stop blinking and stay fixed lit.
The load will be automatically transferred from mains to inverter.
LEDs 1, 2, 3, 4b, 5, 6 and 8 are now lit.
LEDs 4a, 7 and 9 are OFF.
The LCD panel must display the main screen, indicating the status “LOAD ON INVERTER” and the
value of the battery reserve.
7. Load supply.
Your SitePro UPS is now running, supplying power to the output.
Insert the loads one by one to the output of the UPS.
Check the output current value of L1, L2 and L3 and check for correct load balance.
8. Operation mode selection.
SitePro is delivered normally selected for permanent VFI operation.
SEM mode can be enabled and the SEM START time & SEM STOP time can be programmed for each
day of the week (see Section 7.5-7).
NOTE !
The Battery must be charged for at least 10 hours, in order to ensure the full
backup runtime in case of a Mains Failure.