EasyManuals Logo

GE LOGIQ V5 Service Manual

GE LOGIQ V5
305 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #302 background imageLoading...
Page #302 background image
Index-2 LOGIQ V3/V5/V5 Expert – Basic Service Manual
5726264-100 English Rev.8
desirable features, 2-15
DICOM network function, 2-18
DICOM setup requirements, 2-19
InSite requirements, 2-18
network setup requirements, 2-18
purchaser responsibilities, 2-13
recommended floor plan suggestion, 2-17
required facility needs, 2-14
flash card
connect, 3-20
floor plan suggestion
recommended, 2-17
functional checks, 10-13
mains cable inspection, 10-14
system checks, 10-13
G
GE Healthcare leakage current limits, 10-21
general console requirements, 2-3
generic procedure on probe leakage current, 10-28
grounding continuity, 10-24
H
hardware/software compatibility, 9-4
hardware-software
compatibility, 5-3
hot or cold
if the unit is very cold or hot, 2-3
how often should maintenance tasks be performed?,
10-6
human safety, 1-16
I
icons, 1-6
icons indicating a special procedure to be used, 1-9
if the unit is very cold or hot, 2-3
important precautions, i-2
InSite
network requirements, 2-18
installation
see "system setup", 3-1
installation warnings
see "setup warnings", 3-3
introduction (chapter 1), 1-1
L
labels
transportation box label, 3-7
legal notes, i-15
lighting, 2-5
list of abbrevations, 9-3
loading software, 8-5
lockout/tagout (LOTO) requirements, 1-25
LOTO
lockout/tagout requirements, 1-25
M
mains cable inspection, 10-14
maintenance
physical inspection, 10-15
preliminary checks, 10-12
system maintenance, 10-12
maintenance task schedule, 10-6
manufacturer, 1-30
mass
with monitor and peripherals, 3-15
mechanical safety, 1-19
model designations, 1-6
models covered by this manual, 1-5
N
network setup requirements, 2-18
O
omission and errors, i-13
operational and storage temperature for probes, 2-11
P
paperwork
after setup, 3-47
periodic maintenance inspection (PM), PM (periodic
maintenance inspection), 10-4
phone numbers
customer assistance, 1-30
physical dimensions, 3-15
physical inspection
at arrivel, 3-13
Power On, 3-20
precautions
certified electrical contractor statement, i-12
damage in transport, i-12
important precautions, i-2
service safety considerations, i-14
translation policy, i-2
prepeare for setup, 3-13
prerequisite
provided by customer, 8-5
probe
connect, 3-20
probe cleaning, 10-18
probe leakage current test, 10-27
probe maintenance, 10-17
basic probe care, 10-17
basic probe cleaning, 10-18
probe related checks, 10-17
probe related checks, 10-17
probes environmental requirements, 2-11
operational and storage temperature for probes,
2-11
product icons, 1-10

Table of Contents

Other manuals for GE LOGIQ V5

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ V5 and is the answer not in the manual?

GE LOGIQ V5 Specifications

General IconGeneral
BrandGE
ModelLOGIQ V5
CategoryMedical Equipment
LanguageEnglish

Related product manuals