EasyManua.ls Logo

GE Precision RXi

GE Precision RXi
136 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE MEDICAL SYSTEMS PRECISION RXI SYSTEM PRE-INSTALLATION
D
IRECTION 5123449-100, REVISION 12
_____________________________________________________________________________________________
June 2009 Page 47 / 111
IMPORTANT
For details, please make reference to PORTEGRA2 Installation Manual PTZ15002E by
MAVIG
WARNING! PAY ATTENTION!
BEFORE COMMANDING ANY SYSTEM MOVEMENT, YOU SHALL CHECK
THE POSITION OF THE MONITOR SUSPENSION.
Warning! Pay Attention!
Installing the system: MAVIG emphasize that prior to installation to a ceiling, a structural
engineer must certify that the rough ceiling is sufficiently strong to provide proper support for
the system.
Installation must be completed according to local building codes. Failure to follow these
procedures will release MAVIG from responsibility for damages of any sort.
Determination of required installation hardware and torque values for installation of the ceiling
column is sole responsibility of the structural engineer.

Table of Contents

Related product manuals