EasyManua.ls Logo

GMV GLT 81-21 - Page 59

Default Icon
84 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10991793EN
-
19.10.2022
4.0
ENG
GLT
Ω
L
IFT
O
PERATION
M
ANUAL
Page | 59
7 ) Reset the speed governor by pressing on the control panel the button " STL 2 " .
8 ) CAUTION - For the installation with Coated Steel Ropes, proceed to unload weight from the cabin and
start the operation in step " 9 ". CAUTION: immediately stop the unblocking operation as soon as the ropes
begin to slip on the traction sheave ( from the control panel implement the by-pass procedure with the
doors open and visually check the slip from the top end plane ) .
9 ) Using the electric emergency device " QBME " in the operating panel , turn the selector switch to "
electric emergency maneuver " and move the car cabin up in maintenance .
If the safety gear have not released when the drive has reached the maximum current delivery limit ,
proceed to unload weight from the cabin and repeat the operation in step " 9 " .
10 ) Verify the correct mechanical ( visually ) and electrical unlocking of the safety gear ( LEDs " 8 " and " 10
" on the " STK1R " board in the switchboard light up )
11 ) Check the performance of the safety gear by accessing the shaft from the pit or cabin roof , checking
the simultaneity of safety gear deployment according to the track traveled on the guides .
12 ) Restore the rail surface affected by safety gear deployment to safeguard the skids and transit noise .
13 ) On the electric emergency button " QBME " in the operating panel , return the selector switch to "
normal operation " .