EasyManua.ls Logo

Goblin urukay - Chapter 12, Tail; Tail Belt Tensioning and Canopy Installation

Default Icon
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
B
C
A
Servo Spacer
(H0075-S)
Socket Head Cap
Screw M2x6mm
(HC004-S)
Tail Servo Assembly
The distance between the
axis and the ball must be
between 15-16 mm
Uniball
M2
5H6
(H0064-S)
Tail Servo
Socket Head Cap
Screw M2.5x12mm
(HC026-S)
Tail Boom
Assembly
DETAIL A
Carbon Road
Support
(H0394-S)
DETAIL B
15-16mm
Carbon Road
Support B
(H0395-S)
Socket Head Cap
Screw M2.5x12mm
(HC026-S)
DETAIL C
Bag 15
Note:
Lubricate this zone
Lock H0395, doing attention to the maximum
smoothness of the carbon road
Carbon Road
Assembly
(HC451-S)
Note:
* Install H0394 to the boom
* Insert carbon rod through the
boom making sure it is inserted
through H0394
* Install H0395 making sure to reduce
slop (side play) on the carbon rod
Page 28
Chapter 12, Tail

Table of Contents

Related product manuals