7 Commissioning
7.1 Commission The Inverter
7.1.1 Set inverter address
7.1.1.1 Set RS485 address with Shinebus
•If the inverter is stored over one month, its default time and date may
looks wrong, the time and date should be reset before connection to the
grid.
After inverter is started normally, inverter address can be set via RS485/USB converting
to WIFI.When multiple inverters are connected in parallel via RS485, the inverter must
be set to a different communication address. When a single inverter communicates, the
default communication address can be used.
Note: The default communication address of the inverter is 1, which can be set to 1-254.
Fig 7.1
25
26
The 485 address of the inverter can be modified by Shinebus, This operation is
performed by a professional.
7.1.1.2 Set RS485 address on ShinePhone APP
Refer to 8.2 download mobile APP ShinePhone and connect to inverter WIFI to enter
local monitoring page, this operation is performed by a professional.
1>Click “Parameters”;
2>Enter passwor.(When you use it for the first time, you need to set the password
first. Click "Reset password" to enter the OSS account number and password. The
distributor and installer can apply for the OSS account from Growatt. Click "Sign in"
to set the password. After the setting is successful, you can start using it.)
3>Click top item “COM Address”;
4>Click the "Read" button in the upper right corner to read the current communication
address of the inverter;
5> Set inverter com address;
6>Read inverter com address to ensure setting is successful;
1
2
3
4
7
5
6
8
9
The inverter will be set to the appropriate model according to the standards of
different countries or regions before leaving the factory. For example, the inverters
shipped to Australia are configured as Australian model in the factory.
Note: The inverter is configured for Australia at the factory.