5.3 Moving the WIT Inverter
To prevent personal injury caused by a falling inverter, keep balance and be
careful when moving the WIT Inverter as it is heavy.
Plan 1 Hoisting:
1> As shown in Fig 5.6 below, unpack the WIT Inverter (remove the top panel and the support
plates). Then piece the support plates together with the bottom panel. Install the hoisting rings and
pull out the handles. Grasp the handles to turn the WIT Inverter upright. Run a rope strong enough
to bear the inverter through the hoisting rings and hoist the equipment, and then move the inverter
to the installation position;
2> Keep balance when hoisting and moving the WIT Inverter.
Fig 5.6 Hoisting the WIT Inverter
Plan 2 Forklift handling:
1> Unpack the WIT Inverter (remove the top panel and the support plates); turn the equipment
upright (place it on a flat ground or a floor support);
2> As shown in Fig 5.7, operate the forklift to insert the tines into the pallet openings to lift the
inverter and then transport it to the installation position. (The fork width should be smaller than
0.42 m);
3> Keep balance when lifting and moving the WIT Inverter.
Fig 5.7 Moving the WIT Inverter with a forklift