EasyManua.ls Logo

Grundfos SE - Page 94

Grundfos SE
99 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5. Remove the filling plug (412).
412
TM083647
6. Pressurize the seal housing with 0.6 bar air pressure through the open filling plug hole. Keep the pressure on 0.6 bar for 5 minutes.
The natural moisture of compressed air may trigger the moisture switch inside the motor top compartment. Use N
2
or dried air for
the pressure test.
7. Check the pressure loss after 5 minutes. It must be less than 0.1 bar.
8. After the leakage test, fill the seal housing with motor liquid according to the image below. The seal housing is full when the liquid level
reaches the edge of the hole (1).
1
TM083648
9. Insert and tighten the filling plug (412) with the required torque.
10. Insert and tighten the sealing plug (193) with the requried torque.
94
English (GB)

Table of Contents

Other manuals for Grundfos SE

Related product manuals