EasyManua.ls Logo

GTO PRO 2000 - Installation Check-Off List

Default Icon
42 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
41
Installation Check-Off List
(Installer should verify that each item has been completed)
____ Safety instructions have been explained and given to the end user.
____ All power cables, receiver cables and the transformer plugs are secure to assure contact is made for proper perfor-
mance. (petroleum jelly applied to ends)
____ Customer/end user has been instructed on proper use of transmitter.
____ Customer/end user has been instructed on program features of control board and how to either open or close gate in the
event of low-voltage lock-out.
____ Customer/end user has been instructed on how to remove operator arm in the event of an emergency, via manual
disconnect.
____ Customer/end user has been instructed to use silicon spray on the push/pull tube and front and rear mounts for operator
maintenance and service prevention.
____ Trouble shooting guide has been reviewed and Installation Manual has been left with customer/end user.
____ All caution signs and labels have been placed or hung in a highly visible area.
____ A photo has been taken of completed installation from both front and back of the gate, and dated.
____ Review the Accessory Catalog with the customer/end user.
____ Ask customer/end user to fill out customer support card and mail it to GTO.
____ Ask customer/end user to keep all receipts, installation manuals etc. for future reference.

Related product manuals