EasyManua.ls Logo

GTO PRO 2000 User Manual

Default Icon
42 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
1
Table of Contents
Read these instructions before beginning the installation to
become familiar with the parts and installation sequence.
Review safety precautions and operator instructions with
the end user and leave installation manual with them for
future reference.
Safety Instructions -------------------------------------------------------------------- page 2
Caution Signs and Labels ----------------------------------------------------------- page 5
Technical Specifications ------------------------------------------------------------- page 6
Single Gate Operator Parts List --------------------------------------------------- page 7
Installation of First (Single) Gate Operator ------------------------------------- page 9
Preparing the Gate -------------------------------------------------------------- page 9
Installing the Post Bracket Assembly--------------------------------------- page 10
Connecting Operator to Post Bracket Assembly ------------------------- page 12
Installing the Gate Bracket --------------------------------------------------- page 13
Installing the Open and Closed Position Stops --------------------------- page 14
Installing the Control Box ---------------------------------------------------- page 15
Powering the System ----------------------------------------------------------- page 17
Solar Zones and Gate Activity ----------------------------------------------- page 18
Programming the System----------------------------------------------------------- page 20
Setting the Personal Transmitter Code------------------------------------------ page 23
Setting the Limit Switches---------------------------------------------------------- page 24
Mounting the Receiver -------------------------------------------------------------- page 25
Accessory Hookups ------------------------------------------------------------------ page 26
Installation of Second (Dual) Gate Operator ----------------------------------- page 27
Programming for Dual Gate Installations --------------------------------- page 30
Push-To-Open Instructions -------------------------------------------------------- page 31
Maintenance and Troubleshooting ----------------------------------------------- page 33
Warranty and Repair --------------------------------------------------------------- page 35
Masonry Column Installation Information ------------------------------------- page 36
Accessories----------------------------------------------------------------------------- page 37
Installation Check List ------------------------------------------------- Inside Back Cover
Question and Answer IconNeed help?

Do you have a question about the GTO PRO 2000 and is the answer not in the manual?

GTO PRO 2000 Specifications

General IconGeneral
Warranty12-month limited warranty
TypeGate Opener
Gate Length Capacity20 feet
Max Gate Length20 feet
Safety FeaturesObstruction Detection
Remote ControlYes
Power SourceAC or Solar (with optional solar panel kit)

Summary

Special Notes for the System Designer

Special Notes for the Installer

Before Installation

Pre-installation checks for gate operator suitability and gate condition.

During Installation

Key safety precautions and placement guidelines during the gate operator installation process.

After Installation

Responsibilities for explaining operation and safety features to the end-user post-installation.

Special Notes for the Customer / End User

Caution Signs and Labels

Technical Specifications

Single Gate Operator Parts List

Installation of First (single) Gate Operator

Preparing the Gate

Ensuring gate alignment, free swing, and structural integrity before operator installation.

Installing The Post Bracket Assembly

Connecting Operator to Post Bracket Assembly

Installing the Gate Bracket

Installing the Open and Closed Position Stops

Installing the Control Box

Powering the System

Solar Zones and Gate Activity

Programming the System

Setting the Personal Transmitter Code

Setting the Closed Position Limit Switch

Mounting the Receiver

Accessory Hookups

Installation of Second (Dual) Gate Operator

Second Operator Parts List

List of components included for the installation of the second gate operator in a dual system.

Programming for Dual Gate Installations

Push-to-Open Instructions

Determining The Mounting Position of The Post Bracket Assembly

Guidance on positioning the post bracket for push-to-open gates to ensure proper clearance.

Maintenance & Troubleshooting Guide

Warranty and Repair Service

Column Installation Information

Accessories and Other Products from GTO, Inc.

Opening Accessories

Overview of accessories for gate access control, such as keypads, transmitters, and push buttons.

Mounting Accessories

Details on brackets and adapters for mounting the gate operator on different post types.

Locking Accessories

Information on gate locks for enhanced security and securing the gate in open or closed positions.

Powering Accessories

Description of accessories related to powering the gate operator, including transformers, batteries, and solar panels.

Installation Check-Off List

Related product manuals