Guardian 5240 - Test 24- Check Manual Transfer; Switch Operation

Guardian 5240
151 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CONNECT VOM TEST
LEADS ACROSS
DESIRED METER READING
ENERGIZED DE-ENERGIZED
Terminals 6 and 9 Continuity Infinity
Terminals 1 and 7 Infinity Continuity
4. Using jumper wires, connect the positive (+) post of a
12 volt battery to relay Terminal “A” and the negative
(-) battery post to Relay Terminal “B”. The relay should
energize and the VOM should read CONTINUITY.
194
N1A
126
205
E1
23
Figure 2. Transfer Relay Test Points
5. Now, connect the VOM test leads across Relay Terminals
1 and 7.
a.Energize the relay and the meter should indicate
INFINITY.
b. De-energize the relay and the VOM should read
CONTINUITY.
RESULTS:
1. Replace transfer relay if it is defective.
2. If transfer relay checks good go to Test 26.
TEST 24- CHECK MANUAL TRANSFER
SWITCH OPERATION
DISCUSSION:
In automatic operating mode, when utility source volt-
age drops below a preset level, the engine should
crank and start. On engine startup, an “engine warm-
up timer” on the generator circuit board should start
timing. When that timer has timed out (about 15 sec-
onds), the transfer relay should energize to deliver
utility source power to the standby closing coil termi-
nals. If normal utility source voltage is available to the
standby closing coil terminals, but transfer to Standby
does not occur, the cause of the failure may be (a) a
failed standby closing coil and/or bridge rectifier, or
(b) a seized or sticking actuating coil or load contact.
This test will help you evaluate whether any sticking
or binding is present in the transfer mechanism.
PROCEDURE:
1. With the generator shut down, set the generator AUTO-
OFF-MANUAL switch to OFF.
2. Set the generator main circuit breaker to OFF or “Open”.
3. Turn off the utility power supply to the transfer switch,
using whatever means provided (such as a utility source
main line breaker).
DANGER: DO NOT ATTEMPT MANUAL
TRANSFER SWITCH OPERATION UNTIL
ALL POWER VOLTAGE SUPPLIES TO THE
SWITCH HAVE BEEN POSITIVELY TURNED
PART 3
Page 68
“V-TYPE” PREPACKAGED
TRANSFER SWITCHES
SECTION 3.4
DIAGNOSTIC TESTS
Figure 3. Manual Transfer Switch Operation
MANUAL
TRANSFER
HANDLE
TRANSFER
SWITCH
OPERATING
LEVER
MANUAL
TRANSFER
HANDLE
TRANSFER
SWITCH
OPERATING
LEVER
LOAD CONNECTED TO
UTILITY POWER SOURCE
LOAD CONNECTED TO
STANDBY POWER SOURCE