EasyManua.ls Logo

HANGCHA CPCD15 - Page 87

HANGCHA CPCD15
149 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
81
Maint
enanc
e
Item
Maintenance Content
Tool
Daily
(8h)
Every month
and a half
(250h)
Trimonthl
y
(500h)
Semi-annu
ally
(1,000h)
Annually
(2,000h)
Uprig
ht
moun
ting
Fork
arm
.
Check the welding between
the inner/outer mast and
beam for any cracks or
damage
Check the welding between
the tilt cylinder frame and
mast for any poor welding,
cracks or damage
Check the inner/outer mast
for any poor welding, cracks
or damage
Check the fork arm for any
poor welding, cracks or
damage
Check the roller for any
looseness
Check the bearing shaft
bush of the mast for any
wear or damage
Check the bearing cap bolts
of the mast for any
looseness
Inspecti
on
hamme
r
First time
Check the bolts at the
bottom of the lifting
cylinder, bolts at the top of
piston rod, U-bolts and the
bolts of the movable beam
guide rail for any looseness
Inspecti
on
hamme
r
First time
Check the roller, roller shaft
and welding for any cracks
or damage
Regular Maintenance Schedule for the Safety Devices and Accessories

Related product manuals