EasyManuals Logo

Hettich EBA 21 Repair Instructions

Hettich EBA 21
42 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #30 background imageLoading...
Page #30 background image
30/42
11 Short the mains choke coil (L1)
In countries, in which the European standard EN 61000-3-2 applies it is not
allowed to short the mains choke coil.
The mains choke coil reduces the mains input current below the limit values
stated in the above mentioned European standard.
If the centrifuge is run with undervoltage, that is mains frequency 50 Hz with a voltage
< 205 V or mains frequency 60 Hz with a voltage < 210 V the voltage drop of the mains
choke coil can cause the error FU / CCI - ERROR 62.
The short of the mains choke coil will increase the supply voltage of the frequency
converter.
Pull both plugs (Fig. 2, a) from the mains choke coil.
Cut off both plugs and connect the ends of both cables together with a luster terminal
(Fig. 3, a).
Fig. 2 Fig. 3
a
a

Table of Contents

Other manuals for Hettich EBA 21

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Hettich EBA 21 and is the answer not in the manual?

Hettich EBA 21 Specifications

General IconGeneral
BrandHettich
ModelEBA 21
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals