4.2 Flush Mounng with Gang Box
Steps
1.
Cave an installaon hole in the wall. Pull the cable out from the wall.
Note
●
The suggested dimension of the installaon hole is 364.3 mm (W) × 118.6 mm (H) × 40.2 mm
(D).
●
The suggested length of the cables le outside is 250 mm.
2.
Install the gang box into the wall.
1) Remove the plasc sheet of the gang box with the tool.
2) Insert the gang box into the installaon hole. Mark the gang box screw holes' posion with a
marker, and take out the gang box.
3) Drill 4 holes according to the marks on the wall, and insert the expansion sleeves into the
screw holes.
4) Fix the gang box with 4 expansion bolts.
3.
Fix the gap between the gang box and wall with concrete. Remove the
mounng ears with tool
aer concrete is dry. Connect the cables according to the Wiring Descripon.
4.
Insert the door
staon into the gang box. Slide the door staon down and x it with 2 set
screws. Apply Silicone sealant among the joints between the device and the wall (except the
lower side) to keep the raindrop from entering.
Video Intercom Face Recognion Door Staon User Manual
12