EasyManua.ls Logo

HIMA HIMatrix F60 - Construction Depth

HIMA HIMatrix F60
114 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7 Start-Up System Manual Modular Systems
Page 50 of 114 HI 800 191 E Rev. 2.02
Observe the following points:
Mount the subrack on horizontal DIN rails to ensure effective cooling.
A distance of at least 100 mm above and below the subrack must be maintained.
Do not mount the subrack above heating equipment or any heat source.
Only mount the controller with unconnected connectors.
100 mm
100 mm
234,9 mm
Figure 8: Minimum Clearances Applying for the HIMatrix F60
The HIMatrix systems must be mounted such that:
They are not heated up by other devices with high heat emissions.
Devices with high EMC interference do not interfere with HIMatrix systems. Observe the
instructions provided by the manufacturer.
7.2.2 Construction Depth
Due to the connections for communication and I/O level, the HIMatrix F60 system has a
construction depth of 270 mm. The construction depth is measured from the mounting rail.

Table of Contents

Other manuals for HIMA HIMatrix F60

Related product manuals