3.6 Performing Synchronized Measurement with Multiple Instruments
(Multiple-instrument Synchronized Measurement)
82
Connecting 2 instruments (PW3336/PW3337) with a synchronization cable
You will need: Two instruments, one 9165 Connection Cord
1
Verify that both instruments (PW3336/PW3337) have been turned off.
2
Connect the instruments’ EXT SYNC terminals with the 9165 Connection Cord.
3
Turn on the two instruments (PW3336/PW3337). (The order in which the instruments are
turned on does not matter.)
• When performing synchronized measurement with more than three instruments, connect the instrument in
parallel using a BNC adaptor such as a BNC T-adaptor (jack-plug-jack).
• During synchronized measurement, control signals are sent using the 9165 Connection Cord. Never dis-
connect the connection cable during synchronized measurement. Doing so will prevent these signals from
being properly supplied.
9165 Connection Cord
BNC T-adaptor (jack-plug-jack)
Connect to the instrument