EasyManua.ls Logo

Hioki SM-8213 - 1 Preparation before Operation; Unpacking and Checking of the Contents

Hioki SM-8213
58 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1
1. PREPARATION BEFORE OPERATION
1.1 Unpacking and Checking of the Contents
When you have received the carton of the SM-8200 Series super megohmmeter, carefully unpack
it, and take out every thing from the carton.
Although the instrument and its accessories are severely inspected before shipment from factory,
visually check the items and their quantities.
Keep the shipping carton for reuse at a later stage.
1) Visually check the external view of the instrument and its accessories.
2) Check the quantities of the list in accordance with the following list:
Table 1.1 List of Standard Accessories
Item Model No. Q’ty Remarks
Operation manual
1
This item means this booklet.
Power cord
1
Power cord with 3-prong plug with third
for grounding
Measuring rod
(Red)
0GE00002 1
A measuring rod with a 1-
meter cord to be connected to the Rx ‘
socket.
Measuring rod
(Black)
0GE00001 1
A measuring rod with a 1-
meter cord to be connected to the Rx ‘+
socket.
Shorting plug 0GZ00003 1
A plug to be plugged to the
HV-EN socket of the rear of
the instrument. It is plugged
to the HV-EN socket when
shipping from factory.
Important!
When the accessory shorting plug is not plugged to the HV-EN socket on the rear of the
instrument, the measuring high voltage is not output.
Note: The shorting plug is plugged to the HV-EN socket when shipping from factory.
Upon checking the instrument and accessories, if any damage is found, immediately contact
your dealer or Hioki representative.
CAUTION
When plugging the shorting plug, make sure that the power is turned off, otherwise,
there is an electric shock hazard.

Table of Contents

Related product manuals