EasyManua.ls Logo

Hitachi HA820 G2 - Page 140

Hitachi HA820 G2
188 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Hitachi Advanced Server HA820 G2 User Guide 140
3.
Install the TPM cover:
a.
Align the pins on the cover with the openings on the system board.
b.
Press straight down on the middle of the cover until the alignment pins are seated into the
holes.
c.
4.
Secure the rivets into place by pushing them firmly through the holes in the TPM cover.
5.
Proceed to "Preparing the server for operation."
Preparing
the
server for operation
Procedure
1.
Install any options or cables previously removed to access the TPM connector.
2.
Install the access panel.
3.
Do one of the following:
Slide or install the server into the rack.
Install the server into the enclosure.

Table of Contents

Related product manuals