20
Jib furler (option)
To use with the cunningham kit, please follow steps 5,6, 7 & 8 below
5.
Block the jib halyard in the cleat at the tack point, then feed it
through the small pulley. Then lead it down through the stay
adjuster and through the furler.
6.
After that, lead it through the small pulley at the end of
the line that is attached on the briddle toggle on the left
hull .
7.
Lead it through the block fixed on the brid-
dle toggle of the opposite side (right hull).
8.
Lastly secure it in
the cleat on the
front crossbar.