40
22.USEFUL INFORMATION ABOUT CHIMNEYS
The flue must be compliant with current building regulations. The picture below shows how to connect the fume exhaustion pipe to a pre-
existing flue (Figure A1 Figure A2).
23.COMMISSIONING
The stove commissioning can only be carried out after installation and assembling. The device must then be connected to the power supply,
water and fume exhaustion system. The stove's finishing varnish dries after the stove has been used for a couple of times. During the first
few days, the device could cause unpleasant smells. Air out the room to get rid of smells. Remove the tools stored in the pellet tank during
packaging. Make sure there is nothing left inside the tank.
24.FUEL CHARGE
When loading the fuel, make sure the bag containing the pellets doesn't touch the stove. The fuel has to be loaded in the tank, in the
stove upper area. To load the fuel open up the fuel tank lid, wearing adequate protection gloves to avoid burning your skin when touching
the hot parts in the device. In order to avoid the fire to go out, make sure that the level of pellets inside the tank remains constant. Make
sure that the tank lid is always closed. Only open it when loading the fuel. Be careful not to accidentally insert tools and objects, besides
the fuel, inside the fuel tank.
25.IGNITION
Before switching the stove on, perform the following checks:
- Check that the pellet tank is full.
- Remove, clean and thoroughly check the vermiculite flame retardant plate, the brazier and the ash pan then reposition them
correctly.