EasyManua.ls Logo

HP DL360 - ProLiant - G3 - Installing the Server into the Rack

HP DL360 - ProLiant - G3
118 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Server Installation
HP ProLiant DL360 Generation 3 Server Setup and Installation Guide 3-5
HP CONFIDENTIAL
Writer: Richard O. Heath File Name: d-ch3 Server Installation.doc
Codename: Ertl Part Number: 293974-001 Last Saved On: 10/11/02 11:19 AM
Installing the Server into the Rack
CAUTION: To avoid destabilizing the rack, install multiple servers starting from the
bottom of the rack.
CAUTION: Always mount the heaviest item on the bottom of the rack, and work
from the bottom to the top.
To install the server into the rack:
1. Align the rear end of the fixed server rails (1), with the front end of the universal
rack rails (2).
WARNING: The rail release latches can pinch your fingertips.
2. Press the rail release latches and slowly slide the server into the rack.
Figure 3-4: Aligning the rear end of the fixed server rails
with the front end of the universal rack rails

Table of Contents

Other manuals for HP DL360 - ProLiant - G3

Related product manuals