EasyManua.ls Logo

HP ProLiant DL560 Gen10 - Installing a Smart Storage Battery

HP ProLiant DL560 Gen10
146 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing a Smart Storage Battery
The server supports two Smart Storage Batteries, one each for the processor mezzanine board and the
system board.
Prerequisites
Before installing this option, be sure that you have the following:
T-10 Torx screwdriver
The components included with the hardware option kit
Procedure
1. Power down the server (Power down the server on page 38).
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Do one of the following:
Extend the server from the rack (Extend the server from the rack on page 38).
Remove the server from the rack (Removing the server from the rack on page 39).
4. Remove the access panel (Removing the access panel on page 40).
5. If installed, do the following:
a. Remove the air baffle (Removing the air baffle on page 42).
b. Remove the processor mezzanine tray (Removing the processor mezzanine tray on page 47).
c. Remove the 2P pass-through performance board (Removing the 2P pass-through performance
board on page 48).
6. Remove the fan cage (Removing the fan cage on page 46).
7. Install the HPE Smart Storage Battery.
8. Route and connect the cable.
Installing a Smart Storage Battery 103

Table of Contents

Other manuals for HP ProLiant DL560 Gen10

Related product manuals