EasyManua.ls Logo

HP ProLiant ML30 Gen10 - Preparing the Server for Rack Installation

HP ProLiant ML30 Gen10
251 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Preparing the server for rack installationPreparing the server for rack installation
ProcedureProcedure
1. Power down the server
.
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Disconnect all peripheral cables from the server.
4. If installed, unlock and remove the security padlock and/or the Kensington security lock.
For more information, see the lock documentation.
5. Place the server on the side and access panel facing up
.
Preparing the server for rack installation 65

Table of Contents

Related product manuals