Operations 33
6. Connect each power cord to the server.
7. Connect each power cord to the power source.
8. Power up the server (on page 29).
9. Do one of the following:
o For tower models, install the tower bezel (on page 31).
o For rack models, if removed, install the security bezel ("Security bezel option" on page 48).
Extend the server from the rack
WARNING: To reduce the risk of personal injury or equipment damage, be sure that the rack is
adequately stabilized before extending a component from the rack.
1. Remove the security bezel ("Remove the security bezel (optional)" on page 30).
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Loosen the screws from the latch ears and release the latches on each side of the server.
4. Extend the server from the rack.
5. After completing the maintenance procedure, slide the server back into the rack, and then press the
server firmly into the rack to secure it in place.
WARNING: To reduce the risk of personal injury, be careful when pressing the server rail-release
latches and sliding the server into the rack. The sliding rails could pinch your fingers.
Remove the air baffle