EasyManua.ls Logo

HPE ProLiant DL325 Gen11 - Page 125

HPE ProLiant DL325 Gen11
243 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
The riser cage is aligned with the rear chassis.
The riser board is firmly seated on the system board.
b. Simultaneously push and rotate the half-turn spring latch to 180°.
c. Close the spring latch.
10. Install the access panel .
11. Install the server into the rack.
12. Connect all peripheral cables to the server.
13. Connect the power cords:
a. Connect each power cord to the server.
b. Connect each power cord to the power source.
14. Power up the server.
ResultsResults
The installation is complete.
Installing the NS204i-u + secondary low-profile riser cageInstalling the NS204i-u + secondary low-profile riser cage
About this taskAbout this task
CAUTION:CAUTION:
To prevent damage to electrical components, properly ground the server before beginning any installation, removal, or
replacement procedure. Improper grounding can cause electrostatic discharge.
ProcedureProcedure
HPE ProLiant DL325 Gen11 Server User Guide 125

Table of Contents

Other manuals for HPE ProLiant DL325 Gen11

Related product manuals